Fiscal 2026 saw a leap from prototype validation to full-scale aircraft assembly, with cash reserves rising to CAD 78.3 million and strong R&D investment. The Cavorite X7 targets certification by 2030, with a spring 2027 demonstrator, and boasts operating costs up to 75% lower than helicopters.

Based on

This is an AI-generated summary and may contain inaccuracies. Please verify any important information with the original source.