Drilling at Dumbwa has expanded the mineralized strike to 6.7 km, revealing a large, structurally controlled copper system similar to Lumwana. High-grade zones are in core deformation areas, with 3D modeling confirming stacked, near-surface lenses. The project is well-funded, with phase one drilling to finish by mid-September and a maiden resource estimate to follow.

Based on

This is an AI-generated summary and may contain inaccuracies. Please verify any important information with the original source.